Ibps - Aptitude - Time And Work Test

Test Instructions :

1. The Test is 1hr duration.
2. The Test Paper consists of 30 questions. The maximum marks are 30.
3. All the questions are multiple choice question type with three options for each question.
4. Out of the three options given for each question, only one option is the correct answer.
5. Each question is allotted 1 mark for each correct response.
6. 0.25 will be deducted for incorrect response of each question.
Start Test

   Time Left : 00 : 30    : 00

A man, a woman or a boy can do a job in 20 days, 30 days or 60 days respectively. How many boys must assist 2 men and 8 women to do the work in 2 days?

  

  

  

  

  

If 8 men can reap 80 hectares 24 days, then how many hectares can 36 men reap in 30 days?

  

  

  

  

12 men complete a work in 9 days. After they have worked for 6 days, 6 more men join them. How many days will they take to complete the remaining works?

  

  

  

  

  

A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How soon can the work be done if A is assisted by B and C on alternate days?

  

  

  

  

A contract is to be completed in 56 days if 104 persons work, each working at 8 hours a day. After 30 days, 2/5 of the work is completed. How many additional persons should be deployed so that the work will be completed in the scheduled time, each persons now working 9 hours a day.

  

  

  

  

Pipes A and B fill a tank in 5 and 6 hours respectively. Pipe C can empty it in 12 hours. If all the three pipes are opened together, then the tank will be filled in

  

  

  

  

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

  

  

  

  

A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was:

  

  

  

  

A person works on a project and completes 5/8 of the job in 10 days. At this rate, how many more days will he it take to finish the job?

  

  

  

  

A and B can do a piece of work in 72 days; B and C can do it in 120 days; A and C can do it 90 days. In what time can A alone do it?

  

  

  

  

A man completes 5/8 of a job in 10 days. At this rate, how many more days will it takes him to finish the job

  

  

  

  

If a certain number of workmen can do a piece of work in 25 hours, in how many hours will another set of an equal number of men, do a piece of work, twice as great, supposing that 2 men of the first set can do as much work in an hour, as 3 men of the second set do in an hour ?

  

  

  

  

A tank is fitted with 8 pipes, some of them that fill the tank and others that are waste pipe meant to empty the tank. Each of the pipes that fill the tank can fill it in 8 hours, while each of those that empty the tank can empty it in 6 hours. If all the pipes are kept open when the tank is full, it will take exactly 6 hours for the tank to empty. How many of these are fill pipes?

  

  

  

  

30 laborers, working 7 hours a day can finish a piece of work in 18 days. If the laborers work 6 hours a day, then the number of laborers to finish the same piece of work in 30 days, will be:

  

  

  

  

A and B together can complete a work in 12 days. A alone can complete it in 20 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work?

  

  

  

  

10 men, working 6 hours a day can complete a work in 18 days. How many hours a day must 15 men work to complete the same work in 12 days?

  

  

  

  

Two pipes A and B can fill a cistern in 12 minutes and 16 minutes respectively. If both the pipes are opened together, then after how much time B should be closed so that the tank is full in 9 minutes?

  

  

  

  

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

  

  

  

  

A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:

  

  

  

  

In a camp, 95 men had provisions for 200 days. After 5 days, 30 men left the camp. For how many days will the remaining food last now?

  

  

  

  

12 men working 8 hours per day complete a piece of work in 10 days. To complete the same work in 8 days, working 15 hours a day, the number of men required, is:

  

  

  

  

A tap can fill a tank in 6 hours. After half the tank is filled, three more similar taps are opened. What is the total time taken to fill the tank completely?

  

  

  

  

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

  

  

  

  

A car finishes a jouney in ten hours at the speed of 80 km/hr. If the same distance is to be covered in eight hours how much more speed does the car have to gain?

  

  

  

  

  

A and B together can complete a piece of work in 35 days while A alone can complete the same work in 60 days. B alone will be able to complete the same working in:

  

  

  

  

The circumference of two circles is 88 metres and 220 metres respectively. What is the difference between the area of the larger circle and the smaller circle?

  

  

  

  

  

Two pipes A and B can fill a cistern in 37 minutes and 45 minutes respectively. Both pipes are opened. The cistern will be filled in just half an hour, if the B is turned off after:

  

  

  

  

36. If 18 pumps can raise 2170 tones of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tones of water working 9 hours a day?

  

  

  

  

A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

  

  

  

  

24 men working 8 hours a day can finish a work in 10 days. Working at he rate of 10 hours a day, the number of men required to finish the same work in 6 days is

  

  

  

  

  

Note:
  • Click the 'Submit Test' button given in the bottom of this page to Submit your answers.
  • Test will be submitted automatically if the time expired.
  • Don't refresh the page.