Aptitude - Time And Work Test

Test Instructions :

1. The Test is 1hr duration.
2. The Test Paper consists of 30 questions. The maximum marks are 30.
3. All the questions are multiple choice question type with three options for each question.
4. Out of the three options given for each question, only one option is the correct answer.
5. Each question is allotted 1 mark for each correct response.
6. 0.25 will be deducted for incorrect response of each question.
Start Test

   Time Left : 00 : 30    : 00

A wheel that had 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions made by the larger wheel is:

  

  

  

  

16 men can complete a work in 35 days. In many days can 28 men complete the same piece of work?

  

  

  

  

  

A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will they take to complete the job if they all work together?

  

  

  

  

If 18 binders bind 900 books in 10 days, how many  binders will be required to bind 660 books in 12 days?

  

  

  

  

A tap can fill a tank in 16 minutes and another can empty it in 8 minutes. If the tank is already half full and both the tanks are opened together the tank will be:

  

  

  

  

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With the help of C, they did the job in 4 days only. Then, C alone can do the job in:

  

  

  

  

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

  

  

  

  

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

  

  

  

  

X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?

  

  

  

  

One tap can fill a cistern in 2 hours and another tap can empty the cistern in 3 hours. How long will they take to fill the cistern if both the taps are opened?

  

  

  

  

2 men, 3 women and 8 machines take 12 days to complete a job and 6 women and 28 machines take 6 days to complete it. A man and a machine take 45 days to complete it. Find the time taken by a machine to complete it (in days).

  

  

  

  

A, B and C start at the same time in the same direction to run around a circular stadium. A completes a round in 252 seconds, B in 308 seconds and C in 198 seconds, all starting at the same point. After what time will they meet again at the starting point?

  

  

  

  

12 men complete a work in 9 days. After they have worked for 6 days, 6 more men join them. How many days will they take to complete the remaining works?

  

  

  

  

  

9 examiners can examine a certain number of answer books in 12 days by working 5 hours a day. How many hours in a day should 4 examiners work to examine twice the number of answer books in 30 days?

  

  

  

  

12 men take 18 days to complete a job whereas 12 women in 18 days can complete 3/4 of the same job. How many days will 10 me and 8 women together take to complete the same job ?

  

  

  

  

  

x men working x hours per day can do x units of a work in x days. How much work can be completed by y men working y hours per day in y days?

  

  

  

  

Taps A and B can independently fill a tank in 6 and 10 hours. Leak C can empty a filled tank in 8 hours. On an empty tank A, B, C are opened. How long does it take to fill the tank?

  

  

  

  

Two pipes A and B can fill a cistern in 12 minutes and 16 minutes respectively. If both the pipes are opened together, then after how much time B should be closed so that the tank is full in 9 minutes?

  

  

  

  

The circumference of two circles is 88 metres and 220 metres respectively. What is the difference between the area of the larger circle and the smaller circle?

  

  

  

  

  

A and B together can complete a work in 12 days. A alone can complete it in 20 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work?

  

  

  

  

A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the work, the daily wages of B and C are:

  

  

  

  

A and B together can complete a piece of work in 35 days while A alone can complete the same work in 60 days. B alone will be able to complete the same working in:

  

  

  

  

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

  

  

  

  

Two pipes A and B can fill a cistern in 37 minutes and 45 minutes respectively. Both pipes are opened. The cistern will be filled in just half an hour, if the B is turned off after:

  

  

  

  

A pump can fill a tank with water in 2 hours. Because of a leak, it tookhours to fill the tank. The leak can drain all the water of the tank in:

  

  

  

  

A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How soon can the work be done if A is assisted by B and C on alternate days?

  

  

  

  

36. If 18 pumps can raise 2170 tones of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tones of water working 9 hours a day?

  

  

  

  

12 buckets of water fill a tank when the capacity of each tank is 13.5 litres. How many buckets will be needed to fill the same tank, if the capacity of each bucket is 9 litres?

  

  

  

  

A contract is to be completed in 56 days if 104 persons work, each working at 8 hours a day. After 30 days, 2/5 of the work is completed. How many additional persons should be deployed so that the work will be completed in the scheduled time, each persons now working 9 hours a day.

  

  

  

  

A tap can fill a tank in 6 hours. After half the tank is filled, three more similar taps are opened. What is the total time taken to fill the tank completely?

  

  

  

  