Aptitude - Time And Work Test

Test Instructions :

1. The Test is 1hr duration.
2. The Test Paper consists of 30 questions. The maximum marks are 30.
3. All the questions are multiple choice question type with three options for each question.
4. Out of the three options given for each question, only one option is the correct answer.
5. Each question is allotted 1 mark for each correct response.
6. 0.25 will be deducted for incorrect response of each question.
Start Test

   Time Left : 00 : 30    : 00

A wheel that had 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions made by the larger wheel is:

  

  

  

  

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

  

  

  

  

24 men working 8 hours a day can finish a work in 10 days. Working at he rate of 10 hours a day, the number of men required to finish the same work in 6 days is

  

  

  

  

  

A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

  

  

  

  

12 men working 8 hours per day complete a piece of work in 10 days. To complete the same work in 8 days, working 15 hours a day, the number of men required, is:

  

  

  

  

10 men, working 6 hours a day can complete a work in 18 days. How many hours a day must 15 men work to complete the same work in 12 days?

  

  

  

  

Two pipes A and B can fill a cistern in 12 minutes and 16 minutes respectively. If both the pipes are opened together, then after how much time B should be closed so that the tank is full in 9 minutes?

  

  

  

  

A and B can do a work in 10 days. B and C in 12 days while C and A in 15 days. How long would they take if all the three work together?

  

  

  

  

  

A tap can fill a tank in 16 minutes and another can empty it in 8 minutes. If the tank is already half full and both the tanks are opened together the tank will be:

  

  

  

  

A batsman makes a score of 87 runs in the 17th inning and thus increases his averages by 3. What is his average after 17th inning?

  

  

  

  

If 8 men can reap 80 hectares 24 days, then how many hectares can 36 men reap in 30 days?

  

  

  

  

In a camp, 95 men had provisions for 200 days. After 5 days, 30 men left the camp. For how many days will the remaining food last now?

  

  

  

  

If a certain number of workmen can do a piece of work in 25 hours, in how many hours will another set of an equal number of men, do a piece of work, twice as great, supposing that 2 men of the first set can do as much work in an hour, as 3 men of the second set do in an hour ?

  

  

  

  

12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it is to be completed in3 days?

  

  

  

  

  

16 men can complete a work in 35 days. In many days can 28 men complete the same piece of work?

  

  

  

  

  

If 18 pumps can raise 2170 tonnes of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tonnes of water, working 9 hours a day?

  

  

  

  

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

  

  

  

  

12 men take 18 days to complete a job whereas 12 women in 18 days can complete 3/4 of the same job. How many days will 10 me and 8 women together take to complete the same job ?

  

  

  

  

  

Water flows into a reservoir which is 200 m long and 150 m wide, through a pipe of cross-section (0.3m X 0.2m) at 20kmph. In what time will the water level be 8?

  

  

  

  

A and B together can complete a piece of work in 35 days while A alone can complete the same work in 60 days. B alone will be able to complete the same working in:

  

  

  

  

A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was:

  

  

  

  

7 person can do a piece of work in 21 days. How many persons are required to do a piece of work in 3 days?

  

  

  

  

In a regular week, there are 5 working days and for each day, the working hours are 8. A man gets Rs. 2.40 per hour for regular work and Rs. 3.20 per hours for overtime. If he earns Rs. 432 in 4 weeks, then how many hours does he work for?

  

  

  

  

12 years ago the ratio between the ages of A and B was 3 : 4 respectively. The present age of A is 3 3/4 times of C's present age. If C's present age is 10 Years, then what is B's present age? (in years)

  

  

  

  

  

A and B together can complete a work in 12 days. A alone can complete it in 20 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work?

  

  

  

  

A and B working together can finish a job in T days. If A works alone and completes the job, he will take T+5 days. If B works alone and completes the same job, he will take T+45 days. What is T?

  

  

  

  

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

  

  

  

  

X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?

  

  

  

  

A tank is filled in 5 hours by theree pipes A, B and C. The pipe C is twice as fast as B and B is twice as fast as A. How much time will pipe A alone take to fill the tank ?

  

  

  

  

  

10 men and 15 women finish a work in 6 days. One man alone finishes that work in 100 days. In  how many days will a woman finish the work?

  

  

  

  

  

Note:
  • Click the 'Submit Test' button given in the bottom of this page to Submit your answers.
  • Test will be submitted automatically if the time expired.
  • Don't refresh the page.