   Time Left : 00 : 30    : 00

A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was:

  

  

  

  

A man completes 5/8 of a job in 10 days. At this rate, how many more days will it takes him to finish the job

  

  

  

  

A can do a piece of work in 10 days; B in 15 days. They work for 5 days. The rest of the work was finished by C in 2 days. If they get Rs. 1500 for the work, the daily wages of B and C are:

  

  

  

  

A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will they take to complete the job if they all work together?

  

  

  

  

9 examiners can examine a certain number of answer books in 12 days by working 5 hours a day. How many hours in a day should 4 examiners work to examine twice the number of answer books in 30 days?

  

  

  

  

12 men working 8 hours per day complete a piece of work in 10 days. To complete the same work in 8 days, working 15 hours a day, the number of men required, is:

  

  

  

  

Four men and three women can do a job in 6 days. When five men and six women work on the same job, the work gets completed in 4 days. How many days will a woman take to do the job, if she works alone on it?

  

  

  

  

Water flows into a reservoir which is 200 m long and 150 m wide, through a pipe of cross-section (0.3m X 0.2m) at 20kmph. In what time will the water level be 8?

  

  

  

  

If 80 lamps can be lighted, 5 hours per day for 10 days for Rs. 21,25, then the number of lamps, which can be lighted 4 hours daily for 30 days, for Rs. 76.50, is:

  

  

  

  

12 men take 18 days to complete a job whereas 12 women in 18 days can complete 3/4 of the same job. How many days will 10 me and 8 women together take to complete the same job ?

  

  

  

  

  

If 8 men can reap 80 hectares 24 days, then how many hectares can 36 men reap in 30 days?

  

  

  

  

Two pipes A and B can fill a cistern in 12 minutes and 16 minutes respectively. If both the pipes are opened together, then after how much time B should be closed so that the tank is full in 9 minutes?

  

  

  

  

If 18 pumps can raise 2170 tonnes of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tonnes of water, working 9 hours a day?

  

  

  

  

A person works on a project and completes 5/8 of the job in 10 days. At this rate, how many more days will he it take to finish the job?

  

  

  

  

Mr. Ram is on tour and he has Rs 360 for his expenses. If he exceeds his tour by 4 days he must cut down daily expenses by Rs 3. The number of days of Mr. Ram's tour programme is

  

  

  

  

Pipes A and B fill a tank in 5 and 6 hours respectively. Pipe C can empty it in 12 hours. If all the three pipes are opened together, then the tank will be filled in

  

  

  

  

A man, a woman or a boy can do a job in 20 days, 30 days or 60 days respectively. How many boys must assist 2 men and 8 women to do the work in 2 days?

  

  

  

  

  

16 men can complete a work in 35 days. In many days can 28 men complete the same piece of work?

  

  

  

  

  

A tap can fill a tank in 16 minutes and another can empty it in 8 minutes. If the tank is already half full and both the tanks are opened together the tank will be:

  

  

  

  

The average speed of a car is 1(4/5)  times the average speed of a bus. A tractor covers 575 km in 23 hours. How much distance will the car in 4 hours if the speed of the bus is twice speed of the tractor?

  

  

  

  

  

12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it is to be completed in3 days?

  

  

  

  

  

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

  

  

  

  

24 men working 8 hours a day can finish a work in 10 days. Worked at the rate of 10 hours a day, the number of men required to finish the same work in 6 days is :

  

  

  

  

  

A and B together can complete a work in 12 days. A alone can complete it in 20 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work?

  

  

  

  

A car finishes a jouney in ten hours at the speed of 80 km/hr. If the same distance is to be covered in eight hours how much more speed does the car have to gain?

  

  

  

  

  

12 men complete a work in 9 days. After they have worked for 6 days, 6 more men join them. How many days will they take to complete the remaining works?

  

  

  

  

  

A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

  

  

  

  

A contractor undertook to do a certain piece of work in 9 days. He employed certain number of men, but 6 of them being absent from the very first day, the rest could finish the work in 15 days. The number of men originally employed were:

  

  

  

  

In a regular week, there are 5 working days and for each day, the working hours are 8. A man gets Rs. 2.40 per hour for regular work and Rs. 3.20 per hours for overtime. If he earns Rs. 432 in 4 weeks, then how many hours does he work for?

  

  

  

  

If 18 binders bind 900 books in 10 days, how many  binders will be required to bind 660 books in 12 days?

  

  

  

  