   Time Left : 00 : 30    : 00

A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

  

  

  

  

A person works on a project and completes 5/8 of the job in 10 days. At this rate, how many more days will he it take to finish the job?

  

  

  

  

12 buckets of water fill a tank when the capacity of each tank is 13.5 litres. How many buckets will be needed to fill the same tank, if the capacity of each bucket is 9 litres?

  

  

  

  

2 men, 3 women and 8 machines take 12 days to complete a job and 6 women and 28 machines take 6 days to complete it. A man and a machine take 45 days to complete it. Find the time taken by a machine to complete it (in days).

  

  

  

  

A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively, working alone. How soon can the work be done if A is assisted by B and C on alternate days?

  

  

  

  

In a regular week, there are 5 working days and for each day, the working hours are 8. A man gets Rs. 2.40 per hour for regular work and Rs. 3.20 per hours for overtime. If he earns Rs. 432 in 4 weeks, then how many hours does he work for?

  

  

  

  

30 laborers, working 7 hours a day can finish a piece of work in 18 days. If the laborers work 6 hours a day, then the number of laborers to finish the same piece of work in 30 days, will be:

  

  

  

  

10 men and 15 women finish a work in 6 days. One man alone finishes that work in 100 days. In  how many days will a woman finish the work?

  

  

  

  

  

If 18 binders bind 900 books in 10 days, how many  binders will be required to bind 660 books in 12 days?

  

  

  

  

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

  

  

  

  

Rajani has to read a book of 445 pages. She has already read the first 157 pages of the book and if she reads 24 pages of the book everday then how long will she take now to complete the book ?

  

  

  

  

  

A man, a woman or a boy can do a job in 20 days, 30 days or 60 days respectively. How many boys must assist 2 men and 8 women to do the work in 2 days?

  

  

  

  

  

x men working x hours per day can do x units of a work in x days. How much work can be completed by y men working y hours per day in y days?

  

  

  

  

Water flows into a reservoir which is 200 m long and 150 m wide, through a pipe of cross-section (0.3m X 0.2m) at 20kmph. In what time will the water level be 8?

  

  

  

  

Two pipes A and B can fill a tank in 12 minutes and 15 minutes respectively. If both the taps are opened simultaneously, and the tap A is closed after 3 minutes, then how much more time will it take to fill the tank by tap B?

  

  

  

  

There are 12 pipes that are connected to a tank. Some of them are fill pipes and the others are drain pipes. Each of the fill pipes can fill the tank in 8 hours and each of the drain pipes can drain the tank completely in 6 hours. If all the fill pipes and drain pipes are kept open, an empty tank gets filled in 24 hours. How many of the 12 pipes are fill pipes?

  

  

  

  

A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in:

  

  

  

  

A 210m long train takes 6s to cross a man running at 9 kmph in a direction opposite to that of the train. What is the speed of the train? (in kmph)

  

  

  

  

  

36. If 18 pumps can raise 2170 tones of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tones of water working 9 hours a day?

  

  

  

  

10 men, working 6 hours a day can complete a work in 18 days. How many hours a day must 15 men work to complete the same work in 12 days?

  

  

  

  

A and B can do a piece of work in 72 days; B and C can do it in 120 days; A and C can do it 90 days. In what time can A alone do it?

  

  

  

  

Two pipes A and B can fill a cistern in 12 minutes and 16 minutes respectively. If both the pipes are opened together, then after how much time B should be closed so that the tank is full in 9 minutes?

  

  

  

  

A tank is filled in 5 hours by theree pipes A, B and C. The pipe C is twice as fast as B and B is twice as fast as A. How much time will pipe A alone take to fill the tank ?

  

  

  

  

  

Four men and three women can do a job in 6 days. When five men and six women work on the same job, the work gets completed in 4 days. How many days will a woman take to do the job, if she works alone on it?

  

  

  

  

A tank is fitted with 8 pipes, some of them that fill the tank and others that are waste pipe meant to empty the tank. Each of the pipes that fill the tank can fill it in 8 hours, while each of those that empty the tank can empty it in 6 hours. If all the pipes are kept open when the tank is full, it will take exactly 6 hours for the tank to empty. How many of these are fill pipes?

  

  

  

  

Two pipes A and B can fill a tank in 20 and 30 minutes respectively. If both the pipes are used together, then how long will it take to fill the tank?

  

  

  

  

If 80 lamps can be lighted, 5 hours per day for 10 days for Rs. 21,25, then the number of lamps, which can be lighted 4 hours daily for 30 days, for Rs. 76.50, is:

  

  

  

  

16 men can complete a work in 35 days. In many days can 28 men complete the same piece of work?

  

  

  

  

  

12 men working 8 hours per day complete a piece of work in 10 days. To complete the same work in 8 days, working 15 hours a day, the number of men required, is:

  

  

  

  

A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will they take to complete the job if they all work together?

  

  

  

  