1. F – G – J – K – M E – G – I – K – N
2. E – G – I – K – M F – H –I – K – N
3. F – H –J – L – N E – H – I – L – M
4. E – G – J – K – N F – H – J – K – M
E – G – J – K – N
F – H – J – K – M
1. continuous path positioning
2. point-to-point positioning
3. absolute positioning
4. incremental positioning
continuous path positioning
1. P-S-5, R-U-3, P-S-1, Q-T-2
2. P-S-1, R-U-3, P-S -4, P-T-2
3. R-T-3, P-S-1, P-T-4, Q-S-5
4. P-T-4, R-S -3, P-S-1, P-S-5
P-S-5, R-U-3, P-S-1, Q-T-2
1. outside diameter but not roundness
2. roundness but not outside diameter
3. both outside diameter and roundness
4. only external threads
both outside diameter and roundness
1. convection increases, while that due to conduction decreases
2. convection decreases, while that due to conduction increases
3. convection and conduction decreases
4. convection and conduction increases
convection increases, while that due to conduction decreases
1. 3
2. 3.2
3. 4
4. 4.2
3
1. σ=540 ε0.30
2. σ=775 ε0.30
3. σ=540 ε0.35
4. σ=775 ε0.35
σ=540 ε0.30
1. forecasted
2. established by the master production schedule
3. calculated by the MRP system from the master production schedule
4. ignored
calculated by the MRP system from the master production schedule
1. tB=√2 tA
2. tB=2 tA
3. tB=tA /√2
4. tB=2√2 tA
tB=2 tA
1. 1.0 mm
2. 1.5 mm
3. 2.5 mm
4. 3.7 mm
2.5 mm