1. Is the maximum time at which any job stays in the system
2. Is the total protected time
3. Is make-span
4. All of these
All of these
1. Shortest processing time
2. Earlier Due Date (EDD)
3. Dispatching
4. None of these
Shortest processing time
1. Mean lateness
2. Maximum tardiness
3. Maximum tardiness
4. Mean tradness
Mean lateness
1. Minimise the mean lateness
2. Minimise the maximum tardiness
3. Minimise the maximum tardiness
4. Minimise the mean tardiness
Minimise the maximum tardiness
1. Minimise the maximum lateness
2. Be independent of processing times of the job
3. Minimise the maximum tardiness
4. All of these
All of these
1. Mean tardiness
2. Mean lateness
3. Make span
4. Flow time
Make span
1. FCFS (First Come First Served)
2. SPT
3. LWKR (Least Work Remaining)
4. None of these
FCFS (First Come First Served)
1. Number of remaining operations
2. Number of tardy jobs
3. Make span
4. Mean lateness
Number of tardy jobs
1. Production of large volumes of signal or a few types of products
2. Intermittent production of small quantities of many items
3. Ordering raw materials
4. Consumption of new materials
Production of large volumes of signal or a few types of products
1. Materials
2. Quantity and quality
3. Processing details
4. Progress of work on each job or lot
5. All of these
All of these