1. Permanent Way Inspector
2. Gangmate
3. Assistant Permanent Way Inspector
4. None of these are correct
Assistant Permanent Way Inspector
1. 250 to 300 mm
2. 200 to 250 mm
3. 150 to 200 mm
4. 150 mm
200 to 250 mm
1. Steel way
2. Rails
3. Railway
4. Permanent way
Permanent way
1. 10-15 kg/HP
2. 60-80 kg/HP
3. 20-30 kg/HP
4. 100-150 kg/HP
60-80 kg/HP
1. Loose packing at joints
2. Defect in gauge and alignment
3. Defect in cross level joints
4. Any of the above
Any of the above
1. Lift
2. Site distance
3. Rail-head
4. Lead
Lead
1. Track gradient
2. Track slope
3. Super elevation
4. Horizontal gradient
Super elevation
1. Tractive force
2. Load capacity
3. Gauge
4. Track modulus
Track modulus
1. P.W.I
2. Keyman
3. Ganger
4. A.P.W.I
Ganger
1. Wing rail
2. Stock rail
3. Lead rail
4. Point rail
Stock rail