A. 5 hrs
B. 7 hrs
C. 6 hrs
D. 8 hrs
2 men, 3 women and 8 machines take 12 days to complete a job and 6 women and 28 machines take 6 days to complete it. A man and a machine take 45 days to complete it. Find the time taken by a machine to complete it (in days).
Taps A and B can independently fill a tank in 6 and 10 hours. Leak C can empty a filled tank in 8 hours. On an empty tank A, B, C are opened. How long does it take to fill the tank?
A man, a woman or a boy can do a job in 20 days, 30 days or 60 days respectively. How many boys must assist 2 men and 8 women to do the work in 2 days?
A and B together can complete a piece of work in 35 days while A alone can complete the same work in 60 days. B alone will be able to complete the same working in:
A wheel that had 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions made by the larger wheel is:
12 men take 18 days to complete a job whereas 12 women in 18 days can complete 3/4 of the same job. How many days will 10 me and 8 women together take to complete the same job ?
In a regular week, there are 5 working days and for each day, the working hours are 8. A man gets Rs. 2.40 per hour for regular work and Rs. 3.20 per hours for overtime. If he earns Rs. 432 in 4 weeks, then how many hours does he work for?
A tap can fill a tank in 6 hours. After half the tank is filled, three more similar taps are opened. What is the total time taken to fill the tank completely?
If 18 pumps can raise 2170 tonnes of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tonnes of water, working 9 hours a day?
A man takes 20 days to reach the point B under normal circumstances. But, due to the increasingly hostile weather conditions the distance they travel every day reduces by 20%. In how many days would the man reach the point B, taking into consideration weather conditions?