A. 3422 sq.mtrs.
B. 3242 sq.mtrs.
C. 3244 sq.mtrs.
D. 3424 sq.mtrs.
E. None of these
A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was:
A contractor undertook to do a certain piece of work in 9 days. He employed certain number of men, but 6 of them being absent from the very first day, the rest could finish the work in 15 days. The number of men originally employed were:
There are 12 pipes that are connected to a tank. Some of them are fill pipes and the others are drain pipes. Each of the fill pipes can fill the tank in 8 hours and each of the drain pipes can drain the tank completely in 6 hours. If all the fill pipes and drain pipes are kept open, an empty tank gets filled in 24 hours. How many of the 12 pipes are fill pipes?
Four men and three women can do a job in 6 days. When five men and six women work on the same job, the work gets completed in 4 days. How many days will a woman take to do the job, if she works alone on it?
If a certain number of workmen can do a piece of work in 25 hours, in how many hours will another set of an equal number of men, do a piece of work, twice as great, supposing that 2 men of the first set can do as much work in an hour, as 3 men of the second set do in an hour ?
5 men and 2 boys working together can do four times as much work as a man and a boy. Working capacities of a woman and a boy are in the ratio:
10 men and 15 women finish a work in 6 days. One man alone finishes that work in 100 days. In how many days will a woman finish the work?
Rajani has to read a book of 445 pages. She has already read the first 157 pages of the book and if she reads 24 pages of the book everday then how long will she take now to complete the book ?
12 men complete a work in 9 days. After they have worked for 6 days, 6 more men join them. How many days will they take to complete the remaining works?
12 men working 8 hours per day complete a piece of work in 10 days. To complete the same work in 8 days, working 15 hours a day, the number of men required, is: