A. 160
B. 150
C. 24
D. 56
24 men working 8 hours a day can finish a work in 10 days. Working at he rate of 10 hours a day, the number of men required to finish the same work in 6 days is
A, B and C together earn Rs. 300 per day, while A and C together earn Rs. 188 and B and C together earn Rs.152. The daily earning of C is;
36. If 18 pumps can raise 2170 tones of water in 10 days, working 7 hours a day; in how many days will 16 pumps raise 1736 tones of water working 9 hours a day?
A man completes 5/8 of a job in 10 days. At this rate, how many more days will it takes him to finish the job
If santa can walk a certain distance in 200 days when he rests 18 hours each day; how long will it take to walk twice the distance twice as fast and the rest half as long each day ?
The circumference of two circles is 88 metres and 220 metres respectively. What is the difference between the area of the larger circle and the smaller circle?
A and B can do a piece of work in 45 days and 40 days respectively. They began to do the work together but A leaves after some days and then B completed the remaining work in 23 days. The number of days after which A left the work was:
A contractor undertook to do a certain piece of work in 9 days. He employed certain number of men, but 6 of them being absent from the very first day, the rest could finish the work in 15 days. The number of men originally employed were:
There are 12 pipes that are connected to a tank. Some of them are fill pipes and the others are drain pipes. Each of the fill pipes can fill the tank in 8 hours and each of the drain pipes can drain the tank completely in 6 hours. If all the fill pipes and drain pipes are kept open, an empty tank gets filled in 24 hours. How many of the 12 pipes are fill pipes?
Four men and three women can do a job in 6 days. When five men and six women work on the same job, the work gets completed in 4 days. How many days will a woman take to do the job, if she works alone on it?